Toll Construction Company
Quality full service remodeling
Family owned since 1957
317-569-2628
Home Page
Cabinet Photos
Bathrooms
Room Additions Dormers
Master
Bedroom/Bathroom
Basements
Master Bathroom/Third
Floor Sitting Room
The owner’s youngest daughter had just went a way to college
so they wanted to upgrade this part of their home.

This view looking west
is of the existing wall between the
master bedroom and the master bathroom.

This
is the same view showing the new stairway to the new
third floor sitting room. The new entrance to
the new master bathroom is thru the pocket doorway to the left
of the stairway. New Pella casement
windows
(left side of the picture) were installed.
5 1/4 inch crown molding was also installed,
the room was ready to have the final painting
done at the time photo was taken.

This is a view of the rear facade before the interior changes.
This view shows the new third
floor twin casement window,
master bedroom triple casement window and the
new bathroom window.

This is a view looking out from
the
new third floor sitting room.

This is a view looking into the new bathroom.

This is a view of the new
custom shower
with its multiple shower heads.
Home Page
Cabinet Photos
Bathrooms
Room Additions Dormers
Master
Bedroom/Bathroom
Basements